Greensboro, North Carolina
Street Repair
August 2007
This street repair took place in Greensboro, North Carolina. There was a large pothole in the intersection caused by heavy traffic. Poured EZ Street was used to patch hole in two lifts. Each lift was rolled and machine tamped. The repair took about 20-30 minutes.