Winter Utility Cut
January 2009This utility cut was completed in January of '09 at 922 Asbury Ave in Evanston, IL. This was a 7' x 14' sewer repair. The workability of the EZ STREET product in the January cold was very good. The cold asphalt material could be raked. In this way, it performed in a similar manner to hot mix. For this sewer repair, we rolled it, spread it out and compacted it with three passes with a roller. We checked back in with Don Cornelius of Evanston in November of '09 and he had this today: "Well, the product worked the way you said. It held up real well. It didn't push out in the summertime..."
Recent Videos
- Micro trenching featuring EZ Street February 2011
- Cary Parking Lot Repair December 16, 2010
- Greensboro, North Carolina, Skin Patch August 2007
- Greensboro North Carolina Street Repair August 2007
- Water Main Break Repair January 2010
- Winter Cold Patch January 2010
- Winter Utility Cut January 2009
- Woodland St. Bridge Repair November 30, 2010
- EZ Street Australia November 1, 2007
