Woodland St. Bridge Repair
November 30, 2010The Woodland Street Bridge in Nashville, TN needed to be patched in three separate areas. Damaged pavement was dug up and removed. The patch areas were then swept clean and EZ STREET cold asphalt was placed cold with a paver in multiple 2" lifts. After each lift, the product was compacted using a roller. The repair was completed quickly and reopened to traffic immediately.
Recent Videos
- Micro trenching featuring EZ Street February 2011
- Cary Parking Lot Repair December 16, 2010
- Greensboro, North Carolina, Skin Patch August 2007
- Greensboro North Carolina Street Repair August 2007
- Water Main Break Repair January 2010
- Winter Cold Patch January 2010
- Winter Utility Cut January 2009
- Woodland St. Bridge Repair November 30, 2010
- EZ Street Australia November 1, 2007
