Westmont Winter Patch

Westmont Winter Patch



On one of the coldest days of the year (January 27, 2010), the village of Westmont decided to test the limits of EZ Street cold asphalt. When I say "one of the coldest days of the year", I mean one of the coldest days of the year in Chicago. As you can see, the material poured directly from the back of the truck in a workable state. Workers were able to rake the asphalt into place despite the extreme temperatures. A roller was used to compact the asphalt. This was a utility cut filled with concrete and then overlaid with EZ Street cold asphalt.



If you are unsure as to the correct application for EZ Street, please call us at 1-800-734-1476, contact your local sales rep or email us for consultation.