Current orders shipping in 37 hours

50 lb Bags

$64.99

50 LB BAGS

Buy 1: $64.99 each | Buy 2: $61.99 each | Buy 3-13: $58.99 each

$64.99

Revolutionizing Asphalt Repairs:

Experience the trusted quality of EZ STREET®. Tailored for professionals, this 50Lb / 22kg bag is the perfect blend of convenience and efficiency. Whether you’re tackling larger patches or need a reliable solution on the go, EZ STREET® is your go-to choice.

Ground Shipping (3-5 Business Days)

50 LB BAGS

Buy 1: $64.99 each | Buy 2: $61.99 each | Buy 3-13: $58.99 each

$64.99

Revolutionizing Asphalt Repairs:

Experience the trusted quality of EZ STREET®. Tailored for professionals, this 50Lb / 22kg bag is the perfect blend of convenience and efficiency. Whether you’re tackling larger patches or need a reliable solution on the go, EZ STREET® is your go-to choice.

SKU: EZ50WO Category:

Description

Correct installation is crucial for the durability of any paving application. Here’s a brief guide to help ensure maximize the performance of your EZ Street material.

Material
Temperature & Compaction

EZ Street can be applied when air temperatures are between 0° F and 100° F; however, EZ Street will be most pliable, workable, and compactable at air temperatures ranging from 70° F to 90° F. In the winter months, warming of the EZ Street material prior to an application via a “hot box”, heated dump bed, or patching truck is acceptable; although, it is imperative that the material temperature does not exceed 125° F. To ensure optimum performance EZ Street should be applied and compacted in two-inch (2″) maximum lifts. A vibratory steel wheel roller will always provide optimum results and performance; however, steel wheel or pneumatic rollers, compactor plates, wheel rolling, and hand tamping are also acceptable methods of compaction. Over-compaction is rarely an issue.

Installation Procedure
To Achieve Optimum Results

EZ Street will perform best and achieve maximum longevity if the following installation procedures are followed.
Excavate the entire failed pavement surface and unstable base material (including any “alligator” cracked areas).
Clean foreign debris from the area to be patched utilizing a broom or compressed air.
Compact subgrade thoroughly to achieve a firm foundation. The preferred mode of base compaction would be a vibratory compactor plate or steel wheel roller; for small potholes, a hand tamp is acceptable.
Apply EZ Street material in a maximum two two-inch (2″) lifts.
Compact EZ Street after each lift utilizing a vibratory compactor plate or steel wheel roller.
The final EZ Street lift should be placed approximately ¾-1″ higher than the desired finished surface level prior to compaction allowing for optimal compaction and secondary compaction as a result of traffic flow.
EZ Street will perform best and achieve maximum longevity if the following installation procedures are followed.
Excavate the entire failed pavement surface and unstable base material (including any “alligator” cracked areas).
Clean foreign debris from the area to be patched utilizing a broom or compressed air.
Compact subgrade thoroughly to achieve a firm foundation. The preferred mode of base compaction would be a vibratory compactor plate or steel wheel roller; for small potholes, a hand tamp is acceptable.
Apply EZ Street material in a maximum two two-inch (2″) lifts.
Compact EZ Street after each lift utilizing a vibratory compactor plate or steel wheel roller.
The final EZ Street lift should be placed approximately ¾-1″ higher than the desired finished surface level prior to compaction allowing for optimal compaction and secondary compaction as a result of traffic flow.

SWEEP

Sweep out loose debris, dust, rocks—if it’s not fixed to the road, your patch won’t be either. (Water can stay).

FILL

Fill the pothole to one inch above the surrounding surface. For craters deeper than four inches, apply EZ Street in two-inch lifts, compacting each layer before applying the next.

COMPACT

Shovels work. Tamps are good too. But the easiest method is simply driving over the repair a few times until it’s just about level with the road. Traffic will provide secondary compaction.

HOW MUCH
DO YOU NEED?

Check out this usage
guide, or use our product
calculator.

BUY NOW

Additional information

Choose an option

Individual Bags, 1/4 Pallet (14 bags), 1/2 Pallet (28 bags), Full Pallet (56 bags)