BRIDGE RESURFACING

Bridges are key links in a city’s traffic flow, so deck repairs have to be done quickly and with as little disruption as possible. EZ Street® is placed in 2-inch lifts with standard equipment, and because it isn’t hot mix, it can be produced in advance and installed when traffic is lightest. These case studies show EZ Street® resurfacing bridge decks, including Nashville’s Woodland Street Bridge.

Nashville’s Woodland Street Bridge Repair
Bridge Resurfacing

Nashville’s Woodland Street Bridge Repair

At just 639 feet in length, Nashville, Tennessee’s Woodland Street Bridge nonetheless plays an important part of the city’s downtown traffic flow, con...

Continue reading